Banner NYS Insurance Fund - Ground Floor

NYS Insurance Fund - Ground Floor

199 Church Street, New York City

Armand served as construction manager on an interior commercial
renovation of a tenant space on the first floor for a future tenant. Task
Order 2 involves the interior commercial renovation of a tenant space on
the ground floor of NYSIF’s commercial office building. This task included
completing the base building work, such as the storefront, mechanical,
electrical, and plumbing systems (MEPs), and bathroom facilities. This
project covers approximately 6,000 square feet of space. Once NYSIF
executes a lease with a future tenant, Armand will collaborate with the
Design Team during the pre-construction phase to design the space
accordingly.

During the Pre-Construction phase, Armand’s services begin with the
design of each project. Although the NYSIF manages the Design Team
and related consultants, Armand is responsible for integrating the design
and construction phases. This involves utilizing Armand’s expertise
in general contracting to develop schedules, prepare detailed project
construction estimates, study labor conditions, and contribute to the
project’s development in any necessary capacity. Provisions may be
made for early bid packages if the project requires them.

In the Construction Phase, Armand’s services include awarding and
managing numerous principal and specialty trade contracts to provide
the actual construction of the project, as well as managing general
conditions work items like site security and temporary utilities. Armand
ensures the project’s construction is completed within the GMP,
providing all necessary construction services through the awarded Trade
Contractors.

View other projects

 

Client

New York State Insurance
Fund (NYSIF)

Contract Value

$4M

Follow us: